US Army Schoolhouse

Pain Points

Pain Point #1

Military construction projects often face lengthy timelines of 5-7 years for full design-build completion, delaying deployment and operational readiness

Pain Point #2

Traditional brick-and-mortar construction is prohibitively expensive, making it challenging to balance cost, quality, and durability

Pain Point #3

The project required adaptable design options to meet specific functional needs and accommodate unforeseen changes, making flexibility essential to maintaining efficiency

Resolutions

Resolution #1

Streamlined the construction timeline for US Army Schoolhouse, delivering design-build solutions faster than the typical 5-7 years for quicker deployment and readiness

Resolution #2

Provided a cost-effective alternative to traditional construction using modern materials and processes to cut costs while maintaining quality

Resolution #3

Offered adaptable design options for customized functional needs, allowing seamless adjustments for efficiency and cost control throughout the project

SOLUTION SUMMARY

Rapid, Cost-Effective Solution for the U.S. Army. Adventum delivered relocatable structures to a U.S. Army customer, offering a flexible and efficient alternative to traditional MILCON timelines. Our full design services provided tailored solutions that met operational needs while significantly reducing costs by avoiding high construction expenses. These relocatable structures were deployed quickly and efficiently, supporting the Army’s mission with scalable, ready-to-use facilities that maximize value without compromising quality.

Delivery timelines of 3 months and installation time of 2 weeks.